ILDS was actually canceled in late June.
The Protection Vehicle (PV) will not be transferred to a TLAV platform; the project is dead.
The existing PVs, Remote Detection Vehicles and Control Vehicles will be given to the DRDCs or disposed of.
Despite the fact that the PV did have some operational success in Afghanistan, the whole system was still sucking millions for development, was under-achieving, and was in competition for manpower with the RCP/EROC.