little jim
Member
- Reaction score
- 0
- Points
- 230
211RadOp said:No need for the PM.
North is to the right as you look at the picture. All the mod on the north half is accomodations for, in this case, CFJSR, 1 Cdn Div HQ and assorted hangers on.
Two white roofed hardstand building are the abulution buildings.
Mod and S6 (Three pronged tentage) running from the middle to the east is the DIV set up, including the CP, ASIC, Advisors as well as tentage for EXCON and flanking units.
South 1/4 of the whole strip was CFJSR supporting the monstrosity, with elements from RHQ, 1 Sqn, 3 Sqn, 1 Line Sqn and Sp Sqn. We also had some augmentees from the RCN and RCAF.
South of the hardstand is C/S 8 and the NCCIS Det.
Thank you. Learning has occurred.