Hmm, SNC Lavalin, where have we heard of that name before?
 

Colin Parkinson

Army.ca Legend
Reaction score
346
Points
880
Having been involved deeply from the permitting side of this, it's a mammoth project, the Joint Review Panel documents alone were around 60,000 pages plus other studies. Nobody I worked with from the BCH side had worked on something this big before, mainly as no big project like this had been done in BC in a long time. (To be fair, no one on the government side had any experience either) As much as I despise SNC Lavalin, it's not surprising they brought them in as they do have real world experience on large hydroelectric projects.
 